Don took the week off this week to demolish and rebuild the floor in the unused half of the kitchen. We ripped out the bathroom and closets over there a while ago, so it was ready for the floors to be ripped up and rebuilt. Just as he did in the rest of the house, he either sistered joists or laid new ones to create a level base for a new subfloor.
The mudroom created a bit more of a problem - it was, inexplicably, built upon some kind of concrete slab. So when he ripped out the floor, expecting to find more crawlspace, he found instead... concrete. Really hard concrete. It took him all day yesterday just to drill holes in it to secure a low frame for the new subfloor.
Today, all that's left of the project is one section of subfloor and then to run the plumbing for the washer and dryer back out to the mudroom - it got cut back during demolition as it was all over the place. We'd planned to run it beneath the floor - but now we know why it was above the floor to begin with, as there is no way to get anything through that concrete. So we'll run it neatly on the floor along the wall and built a small soffit around it, which will in turn be covered by some sort of bench or shoe rack.
The last step, of course, is to get the washer and dryer out of the dining room and back in place so I can do all of the laundry that's built up this week...
Showing posts with label plumbing. Show all posts
Showing posts with label plumbing. Show all posts
Sunday, July 07, 2013
Wednesday, March 03, 2010
flush
Once we'd painted the office, we realized (somewhat belatedly) that there was something else we should take care of before the floors came. When we ran the plumbing for the new bathrooms, we left the original stack in place. It was cast iron, and very large. So large, in fact, that for some strange reason it stuck out of the base of the office wall. We'd notched around in when we installed the subfloors, and told the drywallers to just cut around it if they couldn't get it flush. They did so, and we realized that it really looked much worse than we thought it would:

The original plan was to just leave it, since we intended to put bookshelves in front of that area anyway. But we've been revising our bookshelf plans now that the end is in sight, and there may not be one at that exact spot. And besides, what about when we go to sell the house? Savvy buyers won't be fooled by a strategically-placed potted plant - even if I was capable of keeping one alive long enough to get the house on the market. And, more immediately, we both hated it. And we live here, and will be doing so for a while. So we called our fantastic plumber, and asked him to come out and take a look. He gave us a huge break on pricing, and replaced not only the bit in the picture, but all of the ancient cast iron pipe in the basement below for several feet straight down and an extra branch out for a price that was seriously, amazingly low. And he did it the day after I called him. (Okay, it was the day after that, but he could have done it the next day if I hadn't had to go to the office.) We had to get it done really fast because the flooring was due to be delivered, and it was no problem. He and his crew are the absolute best.
Once they'd replaced the pipe with one that would fit inside the wall all the way down, I patched the hole in the drywall. You can see the patch in the picture below - it isn't repainted yet, but you can see that not only is there no gaping hole in the wall anymore, but the flooring installers will be able to install all the way to the wall. Everybody's happy.
The original plan was to just leave it, since we intended to put bookshelves in front of that area anyway. But we've been revising our bookshelf plans now that the end is in sight, and there may not be one at that exact spot. And besides, what about when we go to sell the house? Savvy buyers won't be fooled by a strategically-placed potted plant - even if I was capable of keeping one alive long enough to get the house on the market. And, more immediately, we both hated it. And we live here, and will be doing so for a while. So we called our fantastic plumber, and asked him to come out and take a look. He gave us a huge break on pricing, and replaced not only the bit in the picture, but all of the ancient cast iron pipe in the basement below for several feet straight down and an extra branch out for a price that was seriously, amazingly low. And he did it the day after I called him. (Okay, it was the day after that, but he could have done it the next day if I hadn't had to go to the office.) We had to get it done really fast because the flooring was due to be delivered, and it was no problem. He and his crew are the absolute best.
Once they'd replaced the pipe with one that would fit inside the wall all the way down, I patched the hole in the drywall. You can see the patch in the picture below - it isn't repainted yet, but you can see that not only is there no gaping hole in the wall anymore, but the flooring installers will be able to install all the way to the wall. Everybody's happy.
Thursday, October 29, 2009
who wants to take a bath?
The master bathroom tub has finally been set in place. I'm pretty excited about it. For those who are curious, we went with the five-foot Kohler Archer tub, with 'air massage' as opposed to whirlpool jets. (And for the even more curious, Lowe's prices are actually pretty significantly lower than the listed prices from Kohler - worth looking into, plus they offer delivery, and the delivery guys carried it all the way upstairs.) The only thing now missing is the faucet for it, which will actually go in after the tile is set on the tub deck (so that it can be installed neatly through the tiles, instead of trying to cut them to fit around it and having lots of ugly grout lines).
We are going to have to find a tile person soon.
Saturday, October 24, 2009
of course
Something has finally gone wrong. I cannot for the life of me get in touch with the drywaller. I talked to him on Tuesday, and he promised me a callback the following morning with a quote to add insulation to our existing drywall quote. No call, so I called and left a message later that day. Still haven't heard back. I am fairly sure that their phone line goes directly to a voicemail service that he picks up pretty regularly - but I know for a fact that their messages were screwed up a couple of months ago, and I'm wondering if it's happened again. I don't have another number for him, unfortunately.
It's very disappointing - we were hoping to schedule the drywallers/insulators to start on November 2nd, and we're completely on track to be ready for them. But if I can't get hold of him, that's pushing the start date further and further back, because they usually run their schedules about two weeks out.
In any case, the electricians are done with the rough-in, although we need to ask them what we're supposed to do with a couple of things -- there's no box for either the master bathroom tub or the data cable terminus in the office. The plumber's coming on Wednesday to set the tub and fix the sink rough-ins in the master bath. Don ordered several rolls of speaker wire last night, and his sister's boyfriend will come over and wire us up for sound as soon as it comes in. After that, drywall, if I can get hold of the guy!
The real problem with this drywall issue is that I am having my gallbladder taken out on November 12th. If they were able to start on the 2nd, that would give them a good week plus to finish before my surgery, which should be fine. Pushing it back much further may mean we have to delay quite a bit - having drywallers around while you're recovering from surgery is not so practical. All things considered, though, I'd rather reschedule the drywall than the surgery. We'll see how it goes.
It's very disappointing - we were hoping to schedule the drywallers/insulators to start on November 2nd, and we're completely on track to be ready for them. But if I can't get hold of him, that's pushing the start date further and further back, because they usually run their schedules about two weeks out.
In any case, the electricians are done with the rough-in, although we need to ask them what we're supposed to do with a couple of things -- there's no box for either the master bathroom tub or the data cable terminus in the office. The plumber's coming on Wednesday to set the tub and fix the sink rough-ins in the master bath. Don ordered several rolls of speaker wire last night, and his sister's boyfriend will come over and wire us up for sound as soon as it comes in. After that, drywall, if I can get hold of the guy!
The real problem with this drywall issue is that I am having my gallbladder taken out on November 12th. If they were able to start on the 2nd, that would give them a good week plus to finish before my surgery, which should be fine. Pushing it back much further may mean we have to delay quite a bit - having drywallers around while you're recovering from surgery is not so practical. All things considered, though, I'd rather reschedule the drywall than the surgery. We'll see how it goes.
Labels:
contractors,
drywall,
electrical,
plumbing,
schedule
Thursday, October 08, 2009
electricity
Today I emailed an electrician and accepted his quote for doing all of our electrical work. I got quotes from several of them last week, and though we're not thrilled about spending yet another large chunk of money, we've agreed that having somebody come in to do the electrical work is the best idea. They'll be able to get the work done MUCH faster than Don would, and they include a very great deal of work in their proposal that would take Don even longer than just the rewiring. Not to mention they, uh, know what they're doing.
The electrician we eventually went with gently pointed out that the way that Don ran the temporary lights was "the way they did it fifty years ago." Makes sense, given that Don learned from his dad, who learned from HIS dad, who was an electrician - fifty years ago. Sigh. So our new electrician will get it done both quickly and correctly, and we'll be able to move forward.
Speaking of moving forward, check out the vanity we're going to buy for the master bathroom one of these days. Snazzy, no? We may hold off on buying it and just have our drywallers drywall everything but the bathrooms. It'll be annoying but we can afford it. We still have to find a contractor to do various bathroom things like pouring the shower floor and tiling. I'm beginning to feel like calling contractors is my full time job.
The electrician we eventually went with gently pointed out that the way that Don ran the temporary lights was "the way they did it fifty years ago." Makes sense, given that Don learned from his dad, who learned from HIS dad, who was an electrician - fifty years ago. Sigh. So our new electrician will get it done both quickly and correctly, and we'll be able to move forward.
Speaking of moving forward, check out the vanity we're going to buy for the master bathroom one of these days. Snazzy, no? We may hold off on buying it and just have our drywallers drywall everything but the bathrooms. It'll be annoying but we can afford it. We still have to find a contractor to do various bathroom things like pouring the shower floor and tiling. I'm beginning to feel like calling contractors is my full time job.
Wednesday, September 30, 2009
the plumbing post
I finally took some pictures of our plumbing progress! We're on hold until a) the big expensive vanity gets ordered and b) we get drywall and tile and the like so that the finish work can be done. So what we have now is considered rough-ins. But it's lovely to see. It looks like progress!
First up: the guest bathroom. The final studs for the pocket door aren't in place yet -- we had left them off so that the window people could get in and out easily as they took out and sealed up the old window. That's been done, so we'll get those studs in soon. They're super easy to install -- but I have a whole 'nother post coming up about pocket doors. Just you wait. Anyway, as you can see below, the guest bathtub is in! The cat, for some bizarre reason, keeps jumping in it to play. We hear clanging as she flops around in there at night. It's very strange. This bathroom will also have a toilet and a pedestal sink -- space is limited, so we chose pedestal over a full vanity.

The master shower fills me with both excitement and terror. Excitement, because hello, it's awesome. Terror, because I have NO IDEA how we're going to get the base poured. If anybody knows any contractors who do that in this area, let me know. For that matter, if you know somebody who does tile, too, I'd love to hear it. I hate tiling. Hate it HARD. We went to a tile store for some preliminary research a couple of weeks ago, to see how many of our appendages we'd have to sell off to get nice tile (verdict: a lot). I'm wondering if a bathroom contractor of some sort might be able to both get us a better deal and install it for us.

And finally, the rest of the master bathroom! The shower is just to the left out of sight; this picture shows the plumbing rough-ins for the vanity and the bathtub. The toilet will be across from the vanity, between the bathtub and the door -- another pocket door, incidentally.

I won't bore you with the details of what it took to get to this point -- there were decisions made that impacted both the upstairs and the downstairs, but not in any major way. I'm just glad that it's done, and that it looks like we're finally moving forward. Or rather, we would be if I could find an electrician.
First up: the guest bathroom. The final studs for the pocket door aren't in place yet -- we had left them off so that the window people could get in and out easily as they took out and sealed up the old window. That's been done, so we'll get those studs in soon. They're super easy to install -- but I have a whole 'nother post coming up about pocket doors. Just you wait. Anyway, as you can see below, the guest bathtub is in! The cat, for some bizarre reason, keeps jumping in it to play. We hear clanging as she flops around in there at night. It's very strange. This bathroom will also have a toilet and a pedestal sink -- space is limited, so we chose pedestal over a full vanity.
The master shower fills me with both excitement and terror. Excitement, because hello, it's awesome. Terror, because I have NO IDEA how we're going to get the base poured. If anybody knows any contractors who do that in this area, let me know. For that matter, if you know somebody who does tile, too, I'd love to hear it. I hate tiling. Hate it HARD. We went to a tile store for some preliminary research a couple of weeks ago, to see how many of our appendages we'd have to sell off to get nice tile (verdict: a lot). I'm wondering if a bathroom contractor of some sort might be able to both get us a better deal and install it for us.
And finally, the rest of the master bathroom! The shower is just to the left out of sight; this picture shows the plumbing rough-ins for the vanity and the bathtub. The toilet will be across from the vanity, between the bathtub and the door -- another pocket door, incidentally.
I won't bore you with the details of what it took to get to this point -- there were decisions made that impacted both the upstairs and the downstairs, but not in any major way. I'm just glad that it's done, and that it looks like we're finally moving forward. Or rather, we would be if I could find an electrician.
Tuesday, September 29, 2009
waiting in the wings
The last of our bathroom appliances arrived last week. This forest of boxes in the guest room contains two toilets, a pedestal sink (for the guest bathroom), the master bathtub, and faucets galore. The only thing we're missing is our master bathroom vanity, which comes with sinks and faucets and a marble top and is glorious but expensive, so we haven't ordered it yet because we're still trying to pull money around to make it spread to all the things it needs to go to.

In the meantime, the cat is having a lovely time climbing around on the boxes. Most nights, she sleeps curled up on the big one that contains the bathtub. I'm looking forward to getting all of this installed - and more importantly, being able to pee upstairs. Can't wait!
In the meantime, the cat is having a lovely time climbing around on the boxes. Most nights, she sleeps curled up on the big one that contains the bathtub. I'm looking forward to getting all of this installed - and more importantly, being able to pee upstairs. Can't wait!
Thursday, September 17, 2009
we've been busy
Normally, when I go without posting for months at a time, it's because there's nothing happening and I just can't bring myself to whine about it online. This summer's hiatus, however, has definitely been the opposite. There has been SO MUCH going on here, and I feel tres guilty about not posting and telling what few readers I have left about it.
Here's a list of some of the stuff that's been going on here in the last few months:
-As you may have noted in the last post, Don and I finally got married last week, in a civil ceremony at the courthouse. If you are related to me, you will probably find a wedding announcement in your mailbox soon. If not, you'll have to live with the online version. Being married isn't very different from being engaged for seven years, other than the Big Name Change: I'm Jamaila Brinkley now.
-I've had a host of health problems since May; two emergency room visits, countless doctor appointments, and more blood and urine tests than anybody should ever have to go through. In early May, I had my second kidney stone (the first was about six years ago). The followup for that included a cystoscopy, two rounds of antibiotics, and a great deal of nausea, most of which turned out to be unnecessary. During the CT scan, they happened to find out that I have gallstones lurking menacingly around inside of me, too. I'll be having gallbladder removal surgery sometime in the next year, although it's not urgent. In the meantime, I can't have alcohol, caffeine, or extra-greasy foods -- turns out that the gallstones' interactions with those things have been why I've been nauseous practically all the time for the last three or four years. Who knew? Right after all that had gotten cleared up, in early August I abruptly developed gout in my foot, a genetic inheritance I had no idea I was due for. I couldn't walk for two weeks, and slept on an air mattress in the dining room. It was all very exciting.
-While I was battling all of these health issues, somehow -- you're not going to believe this -- the rest of the subfloor and ALL of the framing got done. Yes, we have walls, even though they're just studs. But you can actually see the shape of the rooms in the house!
-After the framing was done, right in the middle of my gout issue, we got PLUMBING. Or rather, we got rough-ins. The plumbers came out, politely ignored me flailing around on my dining room air mattress, and roughed in the plumbing for both upstairs bathrooms. There's a little more rough-in work to be done -- the master bathroom tub was delivered later than expected, and we haven't ordered the master bathroom vanity yet, so they'll be coming back, but most of it is done.
-Our old fridge died, to nobody's dismay. We bought a new fridge, and while we were at it, rearranged the kitchen and finally opened up the wall between it and the dining room. It's a much more pleasant place to cook and clean and hang out now, and the new fridge is AMAZING.
-Right after my gout healed, we went on our annual vacation to Deep Creek Lake with friends, and had an amazing, relaxing, wonderful week. I also turned 27 that week, which was less exciting.
-Don passed Spanish (I know, I couldn't believe it either), and at the beginning of September embarked on what will actually, truly, really be his last semester of college. Undergraduate, anyway. He's applying for January admission into UMBC's graduate program in Human-Centered Computing, and he's really excited about it.
-The last post before my unexpected hiatus announced that we'd hired a landscaper to come in and wrestle the backyard into shape. He did it at the very beginning of the summer, and we've been enjoying it ever since - along with his remarkably reasonable rates for biweekly mowing services.
I've got pictures in various stages of editing for almost all of the house updates; I'll try to post visuals to get you all up to speed right away. I'm sorry to have been gone so long, and to have let so much get done without documenting it here; it got harder and harder to put together an update as more and more got done and we got busier and busier! Right now we're facing a brief plateau as we get ready to get the electrical work done, so I'm going to try to get everything documented and up to date and then we'll go from there.
Here's a list of some of the stuff that's been going on here in the last few months:
-As you may have noted in the last post, Don and I finally got married last week, in a civil ceremony at the courthouse. If you are related to me, you will probably find a wedding announcement in your mailbox soon. If not, you'll have to live with the online version. Being married isn't very different from being engaged for seven years, other than the Big Name Change: I'm Jamaila Brinkley now.
-I've had a host of health problems since May; two emergency room visits, countless doctor appointments, and more blood and urine tests than anybody should ever have to go through. In early May, I had my second kidney stone (the first was about six years ago). The followup for that included a cystoscopy, two rounds of antibiotics, and a great deal of nausea, most of which turned out to be unnecessary. During the CT scan, they happened to find out that I have gallstones lurking menacingly around inside of me, too. I'll be having gallbladder removal surgery sometime in the next year, although it's not urgent. In the meantime, I can't have alcohol, caffeine, or extra-greasy foods -- turns out that the gallstones' interactions with those things have been why I've been nauseous practically all the time for the last three or four years. Who knew? Right after all that had gotten cleared up, in early August I abruptly developed gout in my foot, a genetic inheritance I had no idea I was due for. I couldn't walk for two weeks, and slept on an air mattress in the dining room. It was all very exciting.
-While I was battling all of these health issues, somehow -- you're not going to believe this -- the rest of the subfloor and ALL of the framing got done. Yes, we have walls, even though they're just studs. But you can actually see the shape of the rooms in the house!
-After the framing was done, right in the middle of my gout issue, we got PLUMBING. Or rather, we got rough-ins. The plumbers came out, politely ignored me flailing around on my dining room air mattress, and roughed in the plumbing for both upstairs bathrooms. There's a little more rough-in work to be done -- the master bathroom tub was delivered later than expected, and we haven't ordered the master bathroom vanity yet, so they'll be coming back, but most of it is done.
-Our old fridge died, to nobody's dismay. We bought a new fridge, and while we were at it, rearranged the kitchen and finally opened up the wall between it and the dining room. It's a much more pleasant place to cook and clean and hang out now, and the new fridge is AMAZING.
-Right after my gout healed, we went on our annual vacation to Deep Creek Lake with friends, and had an amazing, relaxing, wonderful week. I also turned 27 that week, which was less exciting.
-Don passed Spanish (I know, I couldn't believe it either), and at the beginning of September embarked on what will actually, truly, really be his last semester of college. Undergraduate, anyway. He's applying for January admission into UMBC's graduate program in Human-Centered Computing, and he's really excited about it.
-The last post before my unexpected hiatus announced that we'd hired a landscaper to come in and wrestle the backyard into shape. He did it at the very beginning of the summer, and we've been enjoying it ever since - along with his remarkably reasonable rates for biweekly mowing services.
I've got pictures in various stages of editing for almost all of the house updates; I'll try to post visuals to get you all up to speed right away. I'm sorry to have been gone so long, and to have let so much get done without documenting it here; it got harder and harder to put together an update as more and more got done and we got busier and busier! Right now we're facing a brief plateau as we get ready to get the electrical work done, so I'm going to try to get everything documented and up to date and then we'll go from there.
Tuesday, January 27, 2009
the first insulation this house has ever had
Once Don had pulled the wire for the new front porch overhead lights and fans, he could start putting insulation between the new joists over the front porch, to keep us from freezing in our bed once we open the porch back up to the elements. It's practically the first insulation that's ever been put in this house (there were some random bits stuck inside an interior wall, doing nobody any good, at one point).
Don and his dad joked that it already felt warmer after the insulation was in, a joke that turned cruel at around midnight on Saturday night when our heat broke. The furnace upstairs just stopped working. Just in time for snow! On Sunday morning, we called BGE Home (we intend to get a service plan with them, as they're sort of the only game in town), who told us they'd get to us on Tuesday (today). They sent a very nice service man out early this morning to tell me that a) we needed to put some "flooring" up in the attic before he'd go further than the fourth step up the attic ladder (there's a piece of plywood up there that gets moved around as portable flooring -- not good enough!) and b) there was a gas leak somewhere so he couldn't look at the furnace without that getting fixed anyway and c) the service division no longer fixes gas leaks -- and, ironically, neither does the utility division. They just find it for you. The utility people, I mean. The service people don't have any equipment at all for dealing with gas. The service people of the gas company. Whatever. He was very nice about the whole thing, and didn't charge me for the visit since he couldn't do anything. He recommended that we call the utility people, have them pinpoint the leak, and then either fix it ourselves or call a plumber.
We elected to bypass the utility people entirely and just call Len the Plumber, who had a plumber out here by 9:30 AM (I called at about 8) -- no two-day wait here! He fixed the gas leak -- there was a defective part in the line, an angled piece of pipe that had apparently been deformed from the start with an almost miniscule hole -- and then, out of the kindness of his heart, fixed the damn furnace too. Two days of huddling under the blankets and being miserable, gone in the blink of an eye.
In any case, I have a lot of photos ready and waiting to be posted about Saturday's work day, but have been too cold and miserable to do anything about it until now. So stay tuned -- my typing fingers are toasty warm!
Labels:
bge,
contractors,
gas,
HVAC,
insulation,
plumbing,
upstairs
Monday, October 13, 2008
plumbing accomplished
I was, for the most part, too buried in work to even take a breath this weekend, but Don and his dad managed to install the water line for the laundry room while I was glued to the computer. I took a break for five minutes this morning to risk life and limb holding things out of the way while Don completed the last few solders, and lo! It's ready. Don spent most of today on his back in the crawlspace wrapping the new pipes with heat tape so we won't have a repeat of last year's pipe-bursting disaster. Or... uh.. the one the year before that. See, progress! We learn from our mistakes! Or rather, other people's mistakes.
In any case, I am officially allowed to start shopping for a washer and dryer now, although we're waiting until at least the second paycheck from Don's new job to come in to actually buy anything. Not that it matters -- I've got five proposals due in four days next week, so washers and dryers will take a second-place to work for a while. Good thing I work from home in my pajamas -- don't have to do laundry nearly so often as I used to!
In any case, I am officially allowed to start shopping for a washer and dryer now, although we're waiting until at least the second paycheck from Don's new job to come in to actually buy anything. Not that it matters -- I've got five proposals due in four days next week, so washers and dryers will take a second-place to work for a while. Good thing I work from home in my pajamas -- don't have to do laundry nearly so often as I used to!
Wednesday, March 28, 2007
Wednesday, March 21, 2007
a romantic surprise
Remember when Don broke the bathtub? Yeah, the bathtub that was already missing a knob? Well, I never told you guys what happened when we went to fix it. (Oho, you say, a STORY!)
First of all, apparently double-knob bathtub faucets have become very unpopular, because we could only find ONE of them at the store. Most of them now seem to have just the one knob in various incarnations. So we bought the single faucet which fit our specifications and took it home.
First things first, we went ahead and took off the remaining knob -- which, of course, stuck, because it was rusted and gross and old. So Don just sort of hacked away at it until it broke off. Then we replaced the faucet itself -- which was the real problem, of course, since Don had broken the diverter. Next we went to replace the knobs and lo! They didn't fit. They were made to fit the pipes that came with the set, which of course were not the same size as ours. Of COURSE.
So, we had fixed the original problem, but in doing so had given ourselves a new problem. Try as we might, we couldn't get the new knobs on without tearing out the wall to get to the plumbing (SO not an option right now). So we put the old rusty vice grip back onto the left knob and hung a pair of pliers over the side of the tub to use to turn the right knob.
If you are pondering renovating your house, be prepared to have to use common hand tools in unusual situations, people. For reals.
Anyway, so things were that way for a few weeks, and then I went away to visit my mom in Washington state for a few days. When I got back, Don picked me up at the airport and drove me home. When we got in, he told me he had a surprise for me: he'd installed two brand new handles for the tub! Thrilled and excited, I rushed in to the bathroom and saw this:

Two brand new vice grips.
First of all, apparently double-knob bathtub faucets have become very unpopular, because we could only find ONE of them at the store. Most of them now seem to have just the one knob in various incarnations. So we bought the single faucet which fit our specifications and took it home.
First things first, we went ahead and took off the remaining knob -- which, of course, stuck, because it was rusted and gross and old. So Don just sort of hacked away at it until it broke off. Then we replaced the faucet itself -- which was the real problem, of course, since Don had broken the diverter. Next we went to replace the knobs and lo! They didn't fit. They were made to fit the pipes that came with the set, which of course were not the same size as ours. Of COURSE.
So, we had fixed the original problem, but in doing so had given ourselves a new problem. Try as we might, we couldn't get the new knobs on without tearing out the wall to get to the plumbing (SO not an option right now). So we put the old rusty vice grip back onto the left knob and hung a pair of pliers over the side of the tub to use to turn the right knob.
If you are pondering renovating your house, be prepared to have to use common hand tools in unusual situations, people. For reals.
Anyway, so things were that way for a few weeks, and then I went away to visit my mom in Washington state for a few days. When I got back, Don picked me up at the airport and drove me home. When we got in, he told me he had a surprise for me: he'd installed two brand new handles for the tub! Thrilled and excited, I rushed in to the bathroom and saw this:
Two brand new vice grips.
Subscribe to:
Posts (Atom)